Contact Us to Reach Chinese Companies Searching for Business Park Space in the United States
Home Park Home Park List Astana – new city

Astana – new city

Calaimed
8.0 million US$/k㎡
Price of land(Subject to actual policy)
73.6km²
Area Covered
Industry:High-end Equipment Manufacturing,Electricity Generation And Transmission Equipment,Chemical Engineering,Light Industry
Tel:400-618-9895
Online
Message
Overview
Information
City
Companies
Third Party
Comments
  • Investment
  • Intro
  • Map

Investment

Price of land:8.0list.parkMu2
(Subject to actual policy)
Subsidy on land: - list.parkMu2
Environmental protection requirement:No Tax on land: - list.parkMu2
Factory rental price range:5 ~ 7 US$/month•㎡Factory sale price range:320 ~ 400 US$/㎡
Office rental price range:15 ~ 30 US$/month•㎡Office sale price range:800 ~ 1000 US$/㎡

Intro

Construction of the aircraft production plant “Kazakhstan Aviation Industry LLP”;

Construction of a plant for the production of metal structures and sandwich-panels “Plant of enclosing constructions SPAN”;

Construction of a plant for production of steel metal structures “Stahlbau” LLP;

Construction of a plant for the production of “GEVO” diesel engines “Astana Diesel Engines”;

Organization of production of military and civil engineering in Kazakhstan “Kazakhstan Engineering Distribution” LLP;

Construction of a plant to produce sewing machines “ZOJE” and textile products “Production innovative company Astana Yutariya Ltd”;

Construction of house building factory based on technology of German equipment “Weckenmann” “GLB” LLP.

Map

搜索当地供应商
按产业查找

Info

Area:73.6 k㎡Information:+7(7172) 70–33–03
Address:Astana, RC "Nursaya-2" st. Dostyk 13
Industries:High-end Equipment Manufacturing,Electricity Generation And Transmission Equipment,Chemical Engineering,Light Industry

Cost

Water:0.07 US$/m³Commercial electricity tariff:0.03 US$/kWh
Heavy industry electricity tariff:0.04 US$/kWhIndustrial electricity tariff (peak):0.08 US$/kWh
Industrial electricity tariff (off-peak):0.03 US$/kWhIndustrial electricty tariff (average):0.06 US$/kWh
Natural gas: - US$/m³ Water treatment:0.67 US$/t.
Minimum wage:64.0 US$/monthOrdinary worker:372.0 US$/month
Land value tax:0

Facilities

Distance to freight station:9km(Too Avtoavangard)Distance to railway station:16km(Astana Nurly Zhol Railway Station)
Distance to habor:No harbor nearbyDistance to airport:10km(Nursultan Nazarbayev International Airport)
Introduction of district:Special economic zones are established in order to accelerate the development of sectors of economy and regions, to attract investment and create highly productive and competitive industries, as well as modern technologies.
Roads logistics:M-36 Chelyabinsk-Almaty and A-343 Astana-Petropavlovsk highways are routed through the city. The strategic geographical positioning of Astana allows the city to serve as a transport and reload centre for cargoes formed at adjacent stations in the area.
Railway logistics:Astana is located in the centre of the country, serving as a well-positioned transport node for rail and automotive networks. Astana railway station is the city's main railway station and serves approximately 7,000 people each day.
Residential housing price in this city:1150.0 US$/㎡
Support for residing in Park:Utility Services
Living environment:ЖК Panorama Park,Строительная компания "G-Park"
Access to supermarkets:EXPOMARKET,ТД "Small"
Commerical enviornment:Sberbank,Halyk Bank ATM
Access to shopping malls:Mega Silk Way,Miniso
Access to hotels:Wyndham Garden Astana,Hilton Astana
Access to leisure and entertainment:Nomad Restaurant,Meat Point,La Jamilya
Access to healthcare:Central Hospital of the Ministry of Internal Affairs
Access to education:NU Graduate School Of Education,COLIBRI EDUCATION

Plan

Construction of the aircraft production plant “Kazakhstan Aviation Industry LLP”; Construction of a plant for the production of metal structures and sandwich-panels “Plant of enclosing constructions SPAN”; Construction of a plant for production of steel metal structures “Stahlbau” LLP; Construction of a plant for the production of “GEVO” diesel engines “Astana Diesel Engines”; Organization of production of military and civil engineering in Kazakhstan “Kazakhstan Engineering Distribution” LLP; Construction of a plant to produce sewing machines “ZOJE” and textile products “Production innovative company Astana Yutariya Ltd”; Construction of house building factory based on technology of German equipment “Weckenmann” “GLB” LLP.
暂无政策数据
暂无产业分布数据
Astana is the new and modern capital of Kazakhstan since December 10, 1997. Astana's strategic position at the heart of Eurasia contributes to its transport and logistics potential. More than 96% of freight traffic passing into Astana is in transit. The city infrastructure and housing is developing rapidly: for several years, the construction sector has been an engine of economic growth. The city will host between June 10 and September 10, 2017 the International Specialized Exhibition EXPO-2017 with the theme "Future Energy"
Nothing
Nothing

Introduction

Construction of the aircraft production plant “Kazakhstan Aviation Industry LLP”; Construction of a plant for the production of metal structures and sandwich-panels “Plant of enclosing constructions SPAN”; Construction of a plant for production of steel metal structures “Stahlbau” LLP; Construction of a plant for the production of “GEVO” diesel engines “Astana Diesel Engines”; Organization of production of military and civil engineering in Kazakhstan “Kazakhstan Engineering Distribution” LLP; Construction of a plant to produce sewing machines “ZOJE” and textile products “Production innovative company Astana Yutariya Ltd”; Construction of house building factory based on technology of German equipment “Weckenmann” “GLB” LLP.

Comments

All Comments

  • Park Replied
No Comments
还可以输入150个字
感谢您的留言

3s后自动关闭